Specifications

Installation and Maintenance Manual - Aastra 5000 AMT/PTD/PBX/0058/4/6/EN
Maintenance 01/2011 Page 419
SHEET E-5REPLACING A VADS VENTILATION MODULE
AVAILABILITY
Full mission capable
OPERATORS (s)
1 operator on site
DURATION
1 minute 30 seconds
1 standard tool case
INGRÉDIENT(S)/CONSOMMABLE(S)
•N/A.
See Figure 4.3 for an overview of the power supply module.
Table 8:
OPERATION DETAILS OF THE OPERATION / COMMENTS
Alert the operator. In the case of remote operation, contact the remote operator
before starting any operation.
Check the functional
technical state of the new
VADS ventilation module.
Check that the functional technical state of the new ventilation
module is compatible with the old one.
Remove the ventilation
module.
Avertissement : The operator has about
90 seconds to make the replacement. After 90 seconds,
the power supply module is automatically powered off.
Unscrew the two securing screws on the front panel of the
ventilation module.
Remove the ventilation module using its handles.
Fit the new VADS
ventilation module.
Insert the ventilation module in its slot and push it fully home.
Secure the ventilation module onto the iPBX structure using its
two captive screws.