Specifications

Installation and Maintenance Manual - Aastra 5000 AMT/PTD/PBX/0058/4/6/EN
Installation and activation 01/2011 Page 351
6.3 Operations on a site already installed
There are several types of operations on a completed installation site:
Hardware operations:
Handling a card
Adding a CLX card
Adding an equipment card
Adding a daughter card to an expansion card or CPU card (EIP)
Adding an expansion cabinet
Adding a power module
Changing to DUPLEX configuration for AXD
Software operations:
Updating the iPBX software
Backing up the configuration
Restoring the configuration associated with the use of VUs
6.3.1 Equipment checklist
If the customer wishes to install equipment from an existing installation, e.g. the customer
may supply a common bell device and an external music source, to determine the overall
size of the new installation, produce a full equipment checklist:
Existing equipment
New equipment.