5.2 Free-standinginline
A . Position the pipe work header in the required location. When using several pipe work 
headers: couple the pipe work headers using the supplied gaskets, M12 (DN65) or 
M16 (DN100) bolts, spring washers and nuts. Align the pipe work header(s) horizon-
tally using the adjustable feet.
B.  Place the gas line in its intended recess. When using several pipe work headers: 
couple  the  gas  lines  using  the  supplied  DN50/DN65  gaskets,  M12  bolts,  spring 
washers and nuts. Refer to gure 5.2.b.
 Fastenthegaslinewiththe2specialclosetoleranceboltsM6x8x16oneach
angeofthepipeworkheader(s).Refertogure5.2.c.
C.  Fit the I-columns on the ange plate using 2x bolts M8x40x70mm.
  Attention:Usethecorrectholesinthecolumn!
 Whenusingaleftangeplate:usetheright-handholesinthecolumn.
 Whenusingaright-handangeplate:usetheleft-handholesinthecolumn.
D.  Fit a mounting frame on the I-column using 3-x bolt M8x50mm. Refer to gure 5.2.e.
  Attention:mountingrailatthetop.
E.  Fit a mounting frame on the other I-column using 3-x bolt M8x50mm. Refer to gure 
5.2.f.
  If boilers also have to be tted on the other side of the I-column, then the next moun-
ting frame also has to be tted straight on it. 
F.  Fit the  remaining  I-column(s)  between  the mounting frames using 3x M8x50mm. 
Refer to gure 5.2.f.
G.  Hang the boilers on the mounting rail. 
 Lifttheboileronlybythespecialgripsonthebottompanel(1)andsupport
theboilerbyitsrearpanel(2).Refertogure5.2.g.
  Continue with chapter 5.4
Figure 5.2.a
Figure 5.2.b
Figure 5.2.c
Figure 5.2.d
OK
Figure 5.2.e
Figure 5.2.f
Figure 5.2.g
1
1
2
2
Liftingandcarryingprecautions:
-  Lift only a manageable weight, or ask for help.
-  When lifting the boiler, bend the knees, and keep the back straight and feet apart.
-  Do not lift and twist at the same time.
-  Lift and carry the boiler close to the body.