Specifications

TroubleshootingGuide
6|Page
*Foreach90degreeelbowadded,deduct5ft.frommax.vent
4.INSTALLATION
TheseguidelinesarequickoverviewsonthemainpointsofinstallationForallinstallationdetails,refer
tothe520(TH2)or320(TH2S) InstallationManualthatispackagedwitheveryheater.Followallcodes
pertainingtotheinstallationofagasappliance.
VENTING
OUTDOORMODELIN STALLATION:
OutdoorinstallationsfallundertheDirect VentClearancespublishedbyANSIZ223.1/NFPA54or
CAN/CSAB149.1
Choosealocationthatmeetsallclearancesrequiredbycode.Thetwomostcommonare:
o 1ft.fromanyopeningintothebuilding,e.g.doors,windows,etc.
o Thetopmustbe
atleast3ft.belowasoffit,ventilatedornonventilated,orbelowan
overhang.
INDOORMODELINSTALLATION:
Refertothefollowingtableforventinglengthmaximums:
Table2
Diameter Max.No.ofElbow Max.Vertical&Horizontal(Total)VentLength
3” 2 25ft.
4” 5 50ft.
TheventingmayconsistofSchedule40PVC,CPVC,ABS,orCategoryIIIStainlessSteel.
InCanada,PlasticventingrequiresULCS636Certifiedmaterials.
DirectVentcombustionairintakeisveryimportant.
o InstalltheDirectVentairintakeopeninginanareathatisfreeof
airbornedebris(lint,
grease,dust,flammableliquids,vapors,orchemicals).Dirtyburnertrayandsensorsare
averycommoncauseoftheheateroperatingimproperly.
o Freshairintakepipingmaybemanifoldedusingthefollowingequation:
(newventcrosssectionalarea)=(numberofheaters)x(5.65)
DONOT:
o Commonventtheexhaustofanytanklessheaterwithanyotherheaterorvented
appliance.
o Terminatetheexhaustintoachimney.Anexistingchimneymaybeusedasachaseto
runexhaustpipeallthewayupandterminatetotheoutside.
o Reduceorincreasethe
ventpipediameterbeyondwhatisspecifiedintheinstallation
manual.