Setup guide
7-10
EPC Connecting Guide
Cabling Instructions
Between 2 Nodes (node #1 and node #2)
Connect one end of the cross–over cable (CBLG161–1900) to the RJ45 port on the
Ethernet 10/100 adapter on node #1, and the other end to the RJ45 port
on the Ethernet 10/100 adapter on node #2.
With a Hub
First of all, a SuperStack II Hub 10 Management Module (3C16630A) has to be fitted to
each Hub 10 12 Port TP unit (3C16670A) to provide SNMP management.
Refer to the vendor publication Superstack II Hub 10 Management User Guide.
Warning: Carefully follow the User Guide instructions when connecting. Otherwise damage
to the hub module could result.
For each node, connect one end of the cable (CBLG179–1900) to a RJ45 port on the Hub
unit and the other end to the RJ45 port on the Ethernet 10/100 MCA adapter of the node.
Connect node #1 to port 1x of the hub,
node #2 to port 2x
node #3 to port 3x
and so on.
With a Switch
For each node, connect one end of the cable (CBLG179–1900) to a RJ45 port on the
Switch unit and the other end to the RJ45 port on the Ethernet 10/100 MCA adapter of the
node.
Connect node #1 to port 1x of the switch,
node #2 to port 2x
node #3 to port 3x
and so on.
If there is a serial port left on the Console Concentrator, an RS–232 cable (CBLG106–2000)
with a 9–pin RS–232C adapter (CBL1912) can be wired between the Console Concentrator
(CS/2600) of the Powercluster and the RS–232 console serial port on the hub
(Management Module) or on the rear of the switch. This pair of cables comes with the
Console Concentrator.
Switch Configuration: to be set to auto–baud, 8 data bits, no parity and 1 stop bit.