User's Manual

5 Upgrading Sapphire 40
7signal Ltd, Panuntie 6, FI-00620 HELSINKI, FINLAND, +358 40 777 7611, info@7signal.com, www.7signal.com
7signal Sapphire Deployment Guide Release 3.1
Configured DB port number is 7722
Current version : x.x
Version to which upgrade: X.X-Y.Y
Enter location of JRE [/opt/7signal/jre]: <enter>
JRE location : /opt/7signal/jre
Java location : /opt/7signal/jre/bin/java
Do you wish to backup databases before proceeding [Y/n] <enter>
Enter directory to which the backed up databases are copied
[/var/opt/7signal/dbms/backups]:
Do you wish to start database upgrade now [Y/n] <enter>
Copying aggregation view template generator and templates to
/home/db7sign/
Installing 7db tool..
Installing 7signal DB backup & restore tool..
Updating version information...
Database upgrade done.
DBMS upgrade is ready when the installer finishes.
5.6 Carat GUI upgrade (Linux)
Step 1: Change to the Carat GUI installer directory:
# cd /root/SapphireXXYY/Carat_GUI/linux
Step 2: Execute Carat GUI installer:
Start the installer by issuing the command:
# ./7signal-Carat-Client-X.X-Y.Y-installer.bin
The installer starts to upgrade the GUI. Confirm the upgrade when the installer asks for
confirmation:
Extracting installer, please wait ...
Launching installer.
Enter location to which 7signal Sapphire Carat client will be
installed [/opt/7signal]: <enter>
Extracting Carat client package...
Found existing installation on given location.
Do you want to upgrade [Y/n]? <enter>
Copying Carat to /opt/7signal...
Extracting jre...
JRE already installed, checking if it is up to date
Installed version: 1.6.0_13-b03
New version : 1.6.0_13-b03
JRE does not need to be updated.
Updating files according to configuration...
Restoring configuration files..
Creating uninstaller...
Finished.
The GUI upgrade is ready when the installer finishes.