User Manual
Table Of Contents
- 1. Getting started
- 2. Introduction
- 3. Preparation
- 4. About the terminal
- 5. Mounting and installing the terminal
- 6. Connecting to the terminal
- 7. Managing the terminal
- 8. Configuring the terminal
- 9. Configuring the traffic interfaces
- 10. Cross Connections
- Embedded cross connect switch
- The Cross Connections application
- The Cross Connections system requirements
- Installing the Cross Connections application
- Opening the Cross Connections application
- The Cross Connections page
- Setting the terminal's address
- Management and user ethernet capacity
- Setting card types
- Getting cross connection configuration from the terminals
- Creating cross connections
- Sending cross connection configuration to the terminals
- Saving cross connection configurations
- Using existing cross connection configurations
- Printing the cross connection configuration
- Deleting cross connections
- Configuring the traffic cross connections
- Cross connection example
- Symmetrical Connection Wizard
- 11. Protected terminals
- 12. In-service commissioning
- What you will need
- Checking the antenna polarization
- Visually aligning antennas
- Accurately aligning the antennas
- Synchronizing the terminals
- Checking performance
- Checking the receive input level
- Checking the fade margin
- Checking long-term BER
- Bit Error Rate tests
- Additional tests
- Checking the link performance
- Viewing a summary of the link performance
- What you will need
- 13. Maintenance
- 14. Troubleshooting
- 15. Interface connections
- 16. Alarm types and sources
- 17. Country specific settings
- 18. Specifications
- Ethernet interface
- QJET Quad E1 / T1 interface
- Q4EM Quad 4 wire E&M interface
- DFXO Dual foreign exchange office interface
- DFXS Dual foreign exchange subscriber interface
- QV24 Quad V.24 asynchronous data interface
- HSS Single high speed synchronous data interface
- External alarm interfaces
- Auxiliary interfaces
- AC Power supply
- DC Power supply
- Power consumption
- MHSB protection
- Ethernet interface
- 19. Product end of life
- 20. Abbreviations
- 21. Acknowledgments and licensing
- 22. Commissioning Forms
- 23. Index

Mounting and installing the terminal | 33
DC Cabling
The DC power input is terminated on the front panel of the terminal with two high-current M3 screw
clamps for the positive and negative DC input and a M5 stud for the earth connection.
The DC power cables have pre-terminated lugs to fit into the power input M3 screw clamps on one
end and bare wire at the other end.
The appropriate power cable for the power supply ordered is included in the accessory kit.
Ensure that one terminal of the DC power supply is earthed from the power ground.
24 VDC / 48 VDC cable
The 24 VDC and 48 VDC power supplies are supplied with a 3 metre red/black cable of 2.0 mm
2
(23
strands of 0.32 mm
2
).
Terminal Power input Cable colour
+V Positive DC input Red
-V Negative DC input Black