User's Manual
Table Of Contents
- 1. Getting started
- 2. Introduction
- 3. Preparation
- 4. About the terminal
- 5. Mounting and installing the terminal
- 6. Connecting to the terminal
- 7. Managing the terminal
- 8. Configuring the terminal
- 9. Configuring the traffic interfaces
- 10. Cross Connections
- Embedded cross connect switch
- The Cross Connections application
- The Cross Connections system requirements
- Installing the Cross Connections application
- Opening the Cross Connections application
- The Cross Connections page
- Setting the terminal's address
- Management and user ethernet capacity
- Setting card types
- Getting cross connection configuration from the terminals
- Creating cross connections
- Sending cross connection configuration to the terminals
- Saving cross connection configurations
- Using existing cross connection configurations
- Printing the cross connection configuration
- Deleting cross connections
- Configuring the traffic cross connections
- Cross connection example
- Symmetrical Connection Wizard
- 11. Protected terminals
- 12. In-service commissioning
- What you will need
- Checking the antenna polarization
- Visually aligning antennas
- Accurately aligning the antennas
- Synchronizing the terminals
- Checking performance
- Checking the receive input level
- Checking the fade margin
- Checking long-term BER
- Bit Error Rate tests
- Additional tests
- Checking the link performance
- Viewing a summary of the link performance
- What you will need
- 13. Maintenance
- 14. Troubleshooting
- 15. Interface connections
- 16. Alarm types and sources
- 17. Country specific settings
- 18. Specifications
- Ethernet interface
- QJET Quad E1 / T1 interface
- Q4EM Quad 4 wire E&M interface
- DFXO Dual foreign exchange office interface
- DFXS Dual foreign exchange subscriber interface
- QV24 Quad V.24 asynchronous data interface
- HSS Single high speed synchronous data interface
- External alarm interfaces
- Auxiliary interfaces
- AC Power supply
- DC Power supply
- Power consumption
- MHSB protection
- Ethernet interface
- 19. Product end of life
- 20. Abbreviations
- 21. Acknowledgments and licensing
- 22. Commissioning Forms
- 23. Index

In-service commissioning | 167
Accurately aligning the antennas
Once the antennas are visually aligned, accurately align both antennas by carefully making small
adjustments while monitoring the RSSI. This will give the best possible link performance.
Note: Remember that it is important to align the main radiation lobes of the two antennas to each
other, not any side lobes. It may be easier to perform this procedure if you can communicate with
someone at the remote site by telephone, mobile, or two-way radio.
1. Connect a laptop PC running SuperVisor software and power up the terminals at both ends of the
link. Select Link > Performance > Summary so that you can see the RSSI indication for the local
terminal. Alternatively, use the RSSI test point on the front panel together with a multimeter (see
"
6Measuring the RSSI” on page 168).
2. Move the antenna through a complete sweep horizontally (known as a 'pan') either side of the
point established in the visual alignment process above. Note down the RSSI reading for all the
peaks in RSSI that you discover in the pan.
3. Move the antenna to the position corresponding to the maximum RSSI value obtained during the
pan. Move the antenna horizontally slightly to each side of this maximum to find the two points
where the RSSI drops slightly.
4. Move the antenna halfway between these two points and tighten the clamp.
5. If the antenna has an elevation adjustment, move the antenna through a complete sweep (known
as a 'tilt') vertically either side of the point established in the visual alignment process above. Note
down the RSSI reading for all the peaks in RSSI that you discover in the tilt.
6. Move the antenna to the position corresponding to the maximum RSSI value obtained during the
tilt. Move the antenna slightly up and then down from the maximum to find the two points where
the RSSI drops slightly.
7. Move the antenna halfway between these two points and tighten the clamp.
8. Recheck the pan (steps 2-4) and tighten all the clamps firmly.
9. Perform steps 1-8 at the remote site.