User's Manual
Table Of Contents
- 1. Getting started
- 2. Introduction
- 3. Preparation
- 4. About the terminal
- 5. Mounting and installing the terminal
- 6. Connecting to the terminal
- 7. Managing the terminal
- 8. Configuring the terminal
- 9. Configuring the traffic interfaces
- 10. Cross Connections
- Embedded cross connect switch
- The Cross Connections application
- The Cross Connections system requirements
- Installing the Cross Connections application
- Opening the Cross Connections application
- The Cross Connections page
- Setting the terminal's address
- Management and user ethernet capacity
- Setting card types
- Getting cross connection configuration from the terminals
- Creating cross connections
- Sending cross connection configuration to the terminals
- Saving cross connection configurations
- Using existing cross connection configurations
- Printing the cross connection configuration
- Deleting cross connections
- Configuring the traffic cross connections
- Cross connection example
- Symmetrical Connection Wizard
- 11. Protected terminals
- 12. In-service commissioning
- What you will need
- Checking the antenna polarization
- Visually aligning antennas
- Accurately aligning the antennas
- Synchronizing the terminals
- Checking performance
- Checking the receive input level
- Checking the fade margin
- Checking long-term BER
- Bit Error Rate tests
- Additional tests
- Checking the link performance
- Viewing a summary of the link performance
- What you will need
- 13. Maintenance
- 14. Troubleshooting
- 15. Interface connections
- 16. Alarm types and sources
- 17. Country specific settings
- 18. Specifications
- Ethernet interface
- QJET Quad E1 / T1 interface
- Q4EM Quad 4 wire E&M interface
- DFXO Dual foreign exchange office interface
- DFXS Dual foreign exchange subscriber interface
- QV24 Quad V.24 asynchronous data interface
- HSS Single high speed synchronous data interface
- External alarm interfaces
- Auxiliary interfaces
- AC Power supply
- DC Power supply
- Power consumption
- MHSB protection
- Ethernet interface
- 19. Product end of life
- 20. Abbreviations
- 21. Acknowledgments and licensing
- 22. Commissioning Forms
- 23. Index

In-service commissioning | 164
Applying power to the terminals
Caution:
Before applying power to a terminal, ensure you have connected the safety earth and antenna cable.
Apply power to the terminals at each end of the link.
When power is first applied, all the front panel LEDs will illuminate red for several seconds as the
system initializes.
After the system is initialized, the OK LED on the front panel should illuminate green and if the
terminals are correctly configured, the TX and RX LED should also be illuminated green.
If the RX LED is:
Red — the antennas are may be significantly mis-aligned with no signal being received.
Orange — the antennas may be roughly aligned with some signal being received.
Green — the antennas are well-aligned and adequate signal is being received to create a
reliable path.
If the TX LED is:
Red — there is a fault in the antenna or feeder cable, or the transmitter is faulty.
Green — this means the transmitter is working normally.
Review the link configurations using SuperVisor
1. Connect a PC, with SuperVisor installed, to both terminals in the link.
2. Log into the link.
3. Select Link > Summary and confirm the following basic information:
Terminal IP address(es)
Terminal TX and RX frequencies
RSSI (dBm)
TX power (dBm)
SNR (dBm)
Note: If the terminals have not already been configured, refer to "
Configuring the terminal" on page
61, "Configuring the traffic interfaces" on page 77, and "Configuring the traffic cross connections" on
page
121.