Installation Manual
Installation
April 24 2015 – Revision 1.0
Page 16 of 76
3M™ Drive-Thru Systems G5 Basestation Model G5B1
Installation Manual
• When charging is complete, the batteries are ready for use.
Notes:
A fully discharged (dead) battery can take as long as 3 ½ hours to recharge.
Fully charged batteries should be stored whenever they are not in use.
Leaving them on the charger does not harm them or waste energy.
Install the Order Point Speaker and Microphone Assemblies
Use the recommended speaker and microphone systems listed below and follow
the included instructions:
• 3M™ Microphone Assembly. Part # 78-6911-4935-1
• 3M™ Speaker Assembly, Duplex, 5 inch. Part # 78-6911-4411-3
For information on wiring the speaker and microphone to the base station, see “
Base Station to Component Wiring,” page 25.
Note: Solder and insulate, using heat shrinkable crimp caps, all connections
including loop, microphone and speaker.
It is recommended that the microphone and speaker be acoustically separated by
treating the speaker post with the 3M Acoustic Kit. For more information refer
to “3M™ Acoustic Kit Installation Guide” in the appendix section on page 65
Install the Vehicle Detector(s)
Follow the instructions provided with the vehicle detectors for installing the
detector loop(s), speakers, and microphones.










