Powerware Uninterruptible Power System Installation and Operator's Manual

Installation
45
Powerware
®
PrestigeSeriesInstallation andOperators ManualforIBMApplications (3000 VA)Uncontrolled Copy
1. Place the conduit through the access hole on the junction box
(see Figure 10). Connect the exposed conduit wires to the
corresponding compression terminals (see the following table).
Tighten the compression terminals with a screwdriver.
2. Pivot the REPO receptacle guard out of the way, plug the REPO
plug/receptacle UPS connector into the REPO receptacle on the
UPS rear panel and twist the connector in place (see Figure 5
on page 37).
Mounting Holes
Plug/Receptacle
UPS Connector
Three Foot Cord
Terminal Block
Access Hole
for Conduit
Figure 10. Optional REPO Cord Junction Box
PowerCable Terminations Tightening Torque
WireFunction Terminal
Position
Terminal Wire
Size Rating*
Entrelec Phoenix
Contact
REPO
L1 TB1-4
L2 TB1-5
12 - 22 AWG
(
4
-
0
m
m
2
)
3.5- 5.3 lb in 5.6- 6.8 lb in
Ground
TB1-6
(
4
-
0
mm
2
)
Suggested wire size is #18-AWG (0.75 mm
2
)75C copper wire minimum.
The REPO function activates when L1 and L2 are shorted together.